Verdi SDI-12 Telemetry Node Installation Guide

Prev Next

Connect Sensor

If you purchased the SDI-12 Sensor and SDI-12 Node from Verdi as a kit, there will be a cable with a connector pre-installed on the sensor and the node to make wiring simple. Plug the 3-pin cable of the Verdi SDI-12 RTU to the 3-pin cable of the sensor. Screw the threaded parts together to create a secure and waterproof connection.

For all other installations, please refer to the wiring diagrams: https://docs.verdi.ag/docs/verdi-sdi-12-telemetry-node-wiring-diagrams

Power On the SDI-12 Node

Attach the antenna by removing the protective cap and screwing it on. WARNING: powering the device without an antenna attached may cause damage to the electronics.

Press and hold the Push Button until the Status LED blinks green 5 times (usually hold for ~5 seconds).

Note: During normal operation, the status LED will blink blue every 3 minutes.

Note: To turn off the Verdi SDI-12 RTU, fast-press the Status Button 5 times. The Red LED will turn solid for 5 seconds, indicating the RTU has been powered off.

Note: Use zip ties (included) or screws to secure the Verdi SDI-12 RTU to a post, pole, or wall

Note: Do not power on the Verdi SDI-12 RTU until you have first connected the sensor to the RTU (Step 2).

Note: If you want to disconnect the sensor from the Verdi SDI-12 RTU, please first power off the Verdi SDI-12 RTU by fast-pressing the Status Button 5 times. The Red LED will turn solid for 5 seconds, indicating the RTU has been powered off.