--- title: "Winterization Procedure for Verdi Equipment" slug: "winterization-sop" tags: ["Tutorial", "SOP"] updated: 2026-10-22T19:47:06Z published: 2026-10-22T19:47:06Z canonical: "docs.verdi.ag/winterization-sop" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.verdi.ag/llms.txt > Use this file to discover all available pages before exploring further. # Winterization Procedure for Verdi Equipment ## Standard Operating Procedure: Winterizing Verdi Equipment **Description:** How to prepare Verdi Gateways, Block Controllers, soil moisture sensors and pressure sensors for the off-season so they come through freezing weather undamaged and restart cleanly in spring. **Written By:** Andrew Munro-West, Technical Support Engineer **Contact Information:** ✉️ support@verdiag.com **Last Updated:** October 21, 2026 ### Introduction: Verdi hardware is built to live outdoors year-round. Gateways, Block Controllers and most soil moisture sensors can stay where they are installed over the winter. A few end-of-season steps protect batteries, seals and pressure-sensitive components from cold, moisture and frost, and make spring start-up fast. Complete this procedure after the final irrigation of the season and before the first hard freeze. It is easiest to do at the same time as the irrigation system itself is drained or blown out. ### Purpose: This SOP gives partners and growers a consistent way to: - Prevent battery leakage, corrosion and unnecessary battery drain while devices are idle. - Keep water out of enclosures by confirming gaskets, lids and connectors are sealed. - Prevent frost damage to pressure sensors by making sure no water is left trapped inside them. - Leave soil moisture sensors undisturbed so readings stay comparable from season to season. - Make sure every valve is left closed and every schedule is paused before power is removed. ### Scope: This SOP applies to Verdi partners and growers with equipment installed in areas where temperatures fall below freezing. It covers: - **Gateway** (Gen 1 and Gen 2, including the Gateway Solar Kit) - **Block Controller** - **Soil moisture sensors:** Irrometer Watermark (200SS), METER TEROS 10, EnviroPro - **Pressure sensors:** Keller America pressure transducers, including those supplied in the Pressure Verification Kit Winterizing the irrigation system itself (blowing out or draining lines, valves, filters and pumps) is not covered here. Follow your irrigation designer's or pump supplier's procedure for that work, and coordinate it with the steps below. #### Summary | Product | Stays in the field? | Remove battery? | Key winter actions | | --- | --- | --- | --- | | Gateway | Yes | **Optional** (Solar Kit sites only) | Inspect seals, cables, antenna and mounting. If you don't need data over winter, remove the Solar Kit battery and store it indoors. | | Block Controller | Yes | **Yes** (9V battery) | Confirm valve is closed and schedules are paused, remove the 9V battery, check the lid O-rings and connectors. | | Soil moisture sensors | Yes, stay in the ground, Unless water-filled | N/A (no battery) | Leave installed, protect and flag cables. Remove only if the field will be tilled or worked. Water-filled tensiometers must be removed. | | SDI-12 Telemetry Node | Yes | **No** (internal battery, rated for cold) | Leave in place with the probe. Rated −40 °C to 85 °C, so no winter prep is needed beyond checking the enclosure and cable. | | Pressure sensors | **Yes**, if the line is drained | N/A (no battery) | Blow out or drain the line as part of normal irrigation winterization. Remove and store indoors only if the line can't be fully drained. | ### Step-by-step instruction #### Before you start - **Timing:** after the last irrigation of the season and before the first hard freeze. - **Tools and materials:** adjustable wrench, pipe plugs to fit the pressure sensor taps, thread seal tape, zip ties, labels or a marker, resealable bags, clean dry cloth, and tall marker flags for buried sensors. - **Record your setup:** photograph each installation and note which device is on which block or zone. Export any season data you want to keep from the Verdi Dashboard (see *Data Export*). #### Step 1: Shut down irrigation in the Verdi Dashboard 1. Pause or delete all irrigation schedules for blocks being winterized, and turn off any Sensor-Driven Automation, Heat and Frost Protection or Automatic Line Flushing rules for those blocks. 2. Send an **OFF** command to every valve and confirm on the Device Card that each one reports closed. > **Important:** Block Controllers drive latching solenoids, which hold their last position when power is removed. A valve that is open when the battery is pulled will stay open. Always confirm the valve is closed before removing the battery. #### Step 2: Gateway The Gateway can stay mounted outdoors over winter. Its enclosure is rated IP65 and its rated operating range is −20 °C to 85 °C. 1. **Decide whether you need winter connectivity.** If you don't use the system over winter, there is no issue powering the Gateway down. If you rely on it for winter data (for example weather stations, soil temperature probes or other sensors you monitor through the winter), keep it powered. 2. **Check the enclosure.** Make sure the lid is fully closed and all screws are tight. 3. **Check cables and connectors.** Power and Ethernet/PoE connections should be fully seated and sealed, with a drip loop below the Gateway so water runs off rather than into the connector. 4. **Check the antenna.** Confirm it is hand-tight and vertical. 5. **Check the mounting.** Re-tighten zip ties or clamps, and check that the mast or pole (and any guy lines) can handle snow, ice and winter wind. 6. **Solar Kit sites: removing the battery is optional.** If you don't need data over winter, we recommend removing the Solar Kit battery and storing it indoors, somewhere dry and above freezing. The Gateway and solar panel can stay mounted, and the Gateway will be offline until the battery is reinstalled in spring. If you do need winter connectivity, you can leave the battery in place, but expect periodic outages depending on the weather: the batteries are rated to −20 °C for output (discharging) but only 0 °C for input (charging), so in cold weather they often stop charging and run down. > **Need full uptime over winter?** Alternative power can be arranged for sites that must stay online all winter. Where possible, we recommend giving the Gateway a dedicated 110 V supply. Contact support@verdiag.com before the season to make arangements. #### Step 3: Block Controller The Block Controller can stay installed on its valve or pole. Its electronics are fully encapsulated and rated from −40 °C to 60 °C. 1. Confirm Step 1 is complete: schedules are paused and the valve reports closed. 2. Open the Block Controller housing and **disconnect and remove the 9V battery**. This prevents battery leakage and corrosion and stops the battery draining while the device is idle. The Block Controller will show as offline on the Dashboard until spring; this is expected. 3. **Inspect the lid O-rings.** The lid seals with rubber O-rings. Wipe them clean and check that they are fully seated and free of dirt, cracks or pinching. 4. Screw the lid back on until it is snug so the O-rings seal all the way around. No tools or extra hardware are needed. 5. Check that the sensor (M12) connector and antenna are tight. If a pressure sensor is being removed (Step 5), protect the open cable end as described there. 6. Make sure solenoid and sensor cables are secured and are not resting in standing water. 7. Recycle or store the removed batteries. Do not reuse partly drained batteries in spring. #### Step 4: Soil moisture sensors Leave soil moisture sensors **installed in the ground** over winter. Pulling and reinstalling a sensor disturbs the soil around it and changes its readings, so leaving it in place keeps data comparable from year to year. **Remove sensors only if** the field will be tilled, ripped or worked, or if harvest or orchard-floor equipment could hit the sensor or its cable. **For all soil moisture sensors:** - Secure exposed cables to a stake or pole, and run cables at the surface through conduit or protective sleeve to prevent rodent damage. - Mark each sensor with a flag tall enough to see above snow so it is not hit by snow-clearing or farm equipment. - **Winter readings are not reliable.** When soil water freezes, sensors read the soil as much drier than it is. Do not use winter readings for decisions. Readings recover once the soil thaws. #### Sensor Specific Procedures **Irrometer Watermark (200SS)****:** Irrometer states the sensor is not affected by freezing temperatures, so it can stay in the ground. If you do need to remove one, pre-wet the soil, dig alongside the sensor and lift it out by the sensor body rather than pulling on the wire. Rinse it clean and store it anywhere it will be easy to find; heated storage is not needed. Reinstall in spring using the standard soak-and-install procedure. **METER TEROS 10:** rated for −40 °C to 60 °C. Leave it installed and protect the surface cable as above. **Tensiometers:** water-filled tensiometers are the exception and **must be removed**. Take them out before the first freeze, drain them and store them indoors. **EnviroPro:** leave the probe installed and make sure the top cap and cable entry are sealed and protected. The probe is rated to −7 °C to 60 °C. Soil in BC and Ontario rarely gets colder than about −2 °C, and soil around 3 ft (1 m) deep is usually well protected, so the buried probe stays well within its rating. If a probe has to be removed, pre-wet the soil the day before, clear soil from around the probe head, attach the extraction clamp just below the cable, and rotate the probe about a quarter turn each way while pulling straight up. Pulling at an angle can damage the probe. **SDI-12 Telemetry Node (EnviroPro)****:** leave the node installed with the probe. The Dragino SDI-12 node is rated from −40 °C to 85 °C, and its internal battery holds up well below freezing, so the battery does not need to be removed and no other winter preparation is needed. Very cold weather can temporarily reduce how much battery capacity is available. Check that the enclosure is closed, the cable to the probe is secured, and the node is not placed where snow and ice will build up on it. If your node is a solar-powered model, its rechargeable battery will not charge below 0 °C. Built-in protection prevents damage, but the node may report less often or go offline during cold spells until temperatures rise. #### Step 5: Pressure sensors Pressure sensors can stay installed over winter as long as the line they are on is fully drained or blown out as part of your normal irrigation winterization. The risk to a pressure sensor is water trapped in its port freezing and expanding, which can damage the sensor or shift its calibration. A dry line removes that risk. 1. Confirm the valve is closed and the line is depressurized (pressure should read zero on the Dashboard). 2. Blow out or drain the line following your normal irrigation winterization procedure, making sure the section of pipe at the sensor is left dry. 3. Check that the sensor cable and connector are secure and sealed. **If the line at the sensor can't be fully drained** (for example, the sensor sits at a low point that holds water), remove the sensor for the winter: 1. Disconnect the sensor from the Block Controller or junction box, noting the wiring if it is hard-wired. Cover the open connector or cable end with a cap or a sealed bag and zip tie so water cannot get into it. 2. Unscrew the sensor using a wrench on its hex fitting only. Never twist it by the body or cable. 3. Drain any water from the sensor port, dry the sensor and cover the port. 4. Close the open tap in the pipe with a pipe plug so dirt, insects and water cannot get in. 5. Label the sensor with its block, zone and device, and store it indoors somewhere dry and above freezing. #### Step 6: Spring start-up 1. **Gateway:** reinstall the Solar Kit battery if it was removed, confirm the Gateway is online and inspect the mounting and antenna for winter damage. 2. **Block Controller:** install a fresh 9V battery. Lithium is recommended: it lasts longer (about 15 months versus about 10 for alkaline under typical use) and handles cold better. Re-check the O-rings, screw the lid back on, then force an uplink to confirm the device is back online (see *Force an Uplink (Network Test) on the Block Controller*). 3. **Pressure sensors:** reinstall any sensors that were removed, wrapping the threads with thread seal tape, and reconnect them. Check that each sensor reads close to zero with the line depressurized, then reads correctly once the line is pressurized. 4. **Soil moisture sensors:** check cables for rodent or equipment damage and confirm readings are reporting. Reinstall any sensors or tensiometers that were removed. 5. Re-enable schedules and automations, then run a short test irrigation on each block and confirm the valves open and close as expected. ### Resources This section lists all external and internal references used in this SOP. - Verdi Docs: [Gateway Spec Sheet](https://docs.verdi.ag/docs/gateway-datasheet); [Gateway Gen 2 Spec Sheet](https://docs.verdi.ag/docs/gateway-gen2-spec-sheet) - Verdi Docs: [Gateway Solar Kit](https://docs.verdi.ag/docs/gateway-solar-kit) - Verdi Docs: [Block Controller Spec Sheet](https://docs.verdi.ag/docs/verdi-block-controller-datasheet) - Verdi Docs: Force an Uplink (Network Test) on the Block Controller - Verdi Docs: [Irrometer Watermark](https://docs.verdi.ag/docs/irrometer-watermark), [Meter Group Soil Moisture](https://docs.verdi.ag/docs/meter-group-soil-moisture-sensors), [EnviroPro](https://docs.verdi.ag/docs/enviropro), [SDI-12 Telemetry Node Spec Sheet](https://docs.verdi.ag/docs/sdi-12-telemetry-node-spec-sheet) - Verdi Docs: [Keller America Pressure Transducers](https://docs.verdi.ag/docs/keller-america-pressure-transducers); [Pressure Verification Kit](https://docs.verdi.ag/docs/pressure-verification-kit) - Verdi Docs: [Data Export](https://docs.verdi.ag/docs/how-to-export-data) - Irrometer: [Watermark 200SS product literature](https://green-ltd.com/hebrew/wp-content/uploads/2022/07/watermark.pdf) ("not affected by freezing temperatures") - METER Group: [TEROS 10 user manual](https://library.metergroup.com/Manuals/18241_TEROS%2010_Pages.pdf) - EnviroPro: [probe installation and removal manual](https://www.instrumentchoice.com.au/attachment/download/162753/65554c16e08bf463753062.pdf) - Dragino: [SDI-12-LB/LS product page](https://www.dragino.com/products/agriculture-weather-station/item/252-sdi-12-lb-ls.html); [SDI-12-CB/CS product page](https://www.dragino.com/products/agriculture-weather-station/item/380-sdi-12-cb-cs.html) - University of Nebraska–Lincoln CropWatch: ["Done Irrigating? Don't Forget to Remove Your Soil Moisture Sensors"](https://cropwatch.unl.edu/done-irrigating-don%25E2%2580%2599t-forget-remove-your-soil-moisture-sensors) ### Appendix #### End-of-season checklist | Item | Done | | --- | --- | | Season data exported and installations photographed | ☐ | | Schedules and automations paused; all valves confirmed closed | ☐ | | Gateway lid, cables, antenna and mounting checked | ☐ | | Solar Kit sites not needing winter data: Gateway battery removed and stored indoors | ☐ | | Block Controller 9V batteries removed | ☐ | | Block Controller O-rings inspected and lids screwed on snug | ☐ | | Soil moisture sensor cables protected and flagged | ☐ | | Water-filled tensiometers removed, drained and stored indoors | ☐ | | SDI-12 Telemetry Node enclosures closed and cables secured | ☐ | | Lines blown out or drained at each pressure sensor | ☐ | | Pressure sensors on lines that can't be drained removed, labelled and stored indoors; taps plugged | ☐ | #### Spring start-up checklist | Item | Done | | --- | --- | | Solar Kit battery reinstalled (if removed) and Gateway online | ☐ | | Fresh 9V battery (lithium recommended) installed in each Block Controller | ☐ | | O-rings checked, lids screwed on snug, uplink forced on each Block Controller | ☐ | | Removed pressure sensors reinstalled and reading correctly | ☐ | | Soil moisture and SDI-12 readings reporting; cables checked for damage | ☐ | | Removed sensors and tensiometers reinstalled | ☐ | | Schedules and automations re-enabled | ☐ | | Test irrigation run on each block | ☐ | ### Revision History: This section records changes made to the document, including the date, summary of changes, and names of approvers.